Picture of bathroom before any work was undertaken.
Electric shower to be replaced with mixer shower.
Suite and tiles removed, new plaster board installed.
Pipe work adjusted, walls made good for tiling, bath installed.
Tiling started around bath.
Tiling completed.
Tiled floor completed, towel rail, wc and basin installed.
Shower installed.
Installation complete.